Skip to main content

Ongoing Resort Development Work in Portugal

The challenge to create a viable mixed-use concept  on a difficult site continues with the many potential upsides needing to overcome physical and planning restrictions.

This has called for a mixed range of inputs requiring market analysis and operational skills available in house but needing to be balanced by the physical possibilities of the site itself.

Working with David Edwards of Placemake (www.placemake.com) and local landscape  professionals , property managers, architects and an experienced hotel developer has enabled the master planning analysis to evolve further  to create a range of accommodation options and a proposed hospitality concept to emerge for further consideration. This has included a wide range of environmental and operational considerations being considered to maximise value, operational efficiency and sustainability.

Share